Formula
A continuous footing is length × width × depth. Pads multiply length × width × depth by the count. A round pier is the count times π r² times the depth. Twenty-seven cubic feet is one cubic yard. Bags are the waste-adjusted cubic feet divided by the bag yield, rounded up. The yields are Quikrete Concrete Mix 1101: 0.60, 0.45, and 0.30 cubic feet.
sticks = 1, when the run fits the stock
sticks = ceil((length − lap) / (stock − lap)), otherwise
The lap is a number you type. This page does not compute a development length. Bar weight uses the ASTM A615 nominal pounds per foot already on the rebar page, for sizes #3 through #6. Feet of bar is the run plus one lap for every splice. A volume over 1 cubic yard after waste gets a ready-mix note. That note is about handling, not a requirement, and it is not a design.
Worked examples
100 ft × 20 in × 10 in. 138.89 ft³, 5.144 yd³. At 10% waste, 5.658 yd³ and 255 bags of the 80 lb mix. The ready-mix note shows because that is over 1 yd³.
Six pads, 24 × 24 × 12 in. 24 ft³, 0.889 yd³. 40 bags of 80 lb mix with no waste, 44 bags at 10%. Eight piers, 12 in diameter × 48 in deep. 25.13 ft³, 0.931 yd³. The strip plus the pads. 162.89 ft³, 6.033 yd³ before waste. Rebar: 100 ft, two #4 bars, 20 ft stock, a 2 ft lap you type. 6 sticks per line, 12 sticks. Five sticks would cover only 92 ft.
Reference
Width, depth, bar size, cover, and lap belong to the local code, the building department, or an engineer. Nothing on this page is a minimum footing or a frost depth.
Questions
Does this size the footing?
No. Width, depth, bar size, and the lap all come from the local code, the building department, or an engineer. This page only turns those dimensions into concrete, bags, and sticks.
Where does the lap come from?
You type it. A required lap is set by the code or the engineer. This page will not invent one, and a lap as long as the stock stick is rejected.
When should I order ready-mix?
The page notes ready-mix once the waste-adjusted volume is over 1 cubic yard. That is a handling suggestion, not a rule. A small pad can still be bags.
How are the sticks counted?
If the run fits one stick, the count is 1. Otherwise each extra stick adds the stock length minus the lap you typed. 100 ft of run, 20 ft sticks, and a 2 ft lap needs 6 sticks per line, because 5 sticks only cover 92 ft.
Which bag yield is this?
The Quikrete Concrete Mix 1101 yields already used on the concrete calculator: 0.60, 0.45, and 0.30 cubic feet for 80, 60, and 40 lb bags.
Sources
- Quikrete Concrete Mix data sheet 1101. An 80 lb bag yields 0.60 cubic feet, a 60 lb bag 0.45, a 40 lb bag 0.30. The same yields are on the concrete calculator.
- ASTM A615 nominal bar weights, the table already on the rebar calculator. #4 is 0.668 lb/ft.