Takeoff

Interior and exterior finish calculators

How many tiles, sheets, posts, squares of siding, boxes of flooring, bags of grout, and bags of insulation. Each takeoff shows the waste next to the geometry.

How these calculators work

Tile starts from the floor area and the tile size. Straight, diagonal, and herringbone each carry a planning waste percent you can change. Boxes round up. Thinset and grout bags use a coverage you type, because the chart on the bag is the one that matters. The joint volume is shown beside that, from the width and the depth of the grout line.

Drywall counts 4 × 8 or 4 × 12 sheets after openings and waste. Tape assumes the sheets hang in a grid, so the seams are the joints between those sheets. Mud and screws are planning rates. A fence is posts at the spacing you set, rails, pickets on the length that is not a gate, and concrete in each hole. The hole is a cylinder minus the dressed post, and the bag yield is the same Quikrete figure as the concrete calculator. A gate hangs on the line posts. It does not add a post.

Siding counts squares, panels or planks, starter, J-channel, and corner posts. A square is 100 square feet. Coverage is the piece length times the exposure. The manufacturer’s sheet wins.

Flooring counts net area, full boxes, and a carpet roll both ways. Waste starts at 10 percent for a straight lay. The coverage on the carton wins. Grout is the joint volume times a density checked against a Custom Building Products chart. The chart on the bag still wins. Insulation counts batt packages from the package coverage, or blown-in bags from the chart on the bag. The R-value table is an estimate, not an energy audit.